Laura Ramirez Portfolio

Architecture Portfolio

Loading publication...

LAURA RAMIREZ AIA • NCARB • NOMA ARCHITECTURAL PORTFOLIO

ABOUT ME I am Laura Ramirez, an artist and architect with 8 years of experience currently based in Fayetteville, Arkansas, in the process of moving to the Reno-Tahoe area. I have worked with a variety of project types and sizes on the architecture side as a Designer and Project Manager, as well as on the client side as a Design Coordinator. I am passionate about creating spaces that foster community and bring people together. I believe in designing spaces that heal and aid daily tasks; that are not just aesthetic but functional to the users. I believe in designing spaces that work and function for all not just by meeting requirements but finding ways to enhance user experience and make people’s days seamless. Through my volunteer work and teaching I embed myself in the communities I am part of. I believe giving back and sharing knowledge is the best way to connect to others. I enjoy working in a collaborative environment where ideas run freely and there is a place to explore new ways of doing the work. In the office I have served as a mentor to my colleagues and have led software training sessions to support colleagues with different backgrounds. EMAIL: LAURAAMELIAR08@GMAIL.COM PHONE: 973•722•3864 ART WEBPAGE: PATTERN-ETCH.COM ART IG: @PATTERN_ETCH

HIGH-END RESIDENTIAL Palmas 79 Renovation Caleton 99 SKETCHES FABRICATION EDUCATION Valley Springs High School England Elementary School Omaha fema shelter INDEX MULTIFAMILY Volare Town Branch COMMERCIAL Nabholz Office

Street View

VALLEY SPRINGS HIGH SCHOOL VALLEY SPRINGS, AR FIRM: MODUS STUDIO PROJECT TYPE: EDUCATION 26,810 SF BUILT 2020 AIA ARKANSAS MERIT AWARD WINNER 2022 RESPONSIBILITIES: • Co-project manager • Facade studies • Construction details design and coordination using Revit • Finishes selection • Spec writing • Chemistry lab equipment research • Millwork design • Renderings using Lumion • Client presentations • Interior way-finding and branding • Submittal and RFI management • Attending AOC meetings The high school was one of four projects for the school. The existing high school program was using several scattered buildings around the campus for classes. They needed an integrated building for the students that would function as a welcoming symbol for the school. Main Stair + Custom Trophy Case Reception- Custom Millwork Side Entry Main Entry

Laboratory- Custom Millwork Laboratory- Custom Millwork Restroom Signage + Tile Library Interior MEETING SPACES A critical design priority was to create meeting spaces for the students and the faculty to convene in between and after classes and still have ample space for social distance. The school was set to open during the first wave of covid so the priorities changed as the project evolved. The library was one of the main focuses for the school. We wanted to make a space that felt light and peaceful for the students. The polycarbonate panels let light in without becoming bothersome to those studying. The atrium became one of these spaces where people gravitated to meet naturally. The custom bench became a place to rest and share. The storefronts visually connect the reception, the lobby and the library making the space feel as one but adding a level of security at the same time. Above the gabion wall there is an exterior roof garden that serves as an exterior classroom right outside the biology lab. This space gives students a well deserved break from the classroom monotony and gives them hands-on learning from the plants they take care of. INTERIOR DETAILS Natural wood, steel accents and custom millwork together with custom way finding and signage worked together to make the interior design feel cohesive and elevated. By using innovative design choices we stretched the limited funds to deliver the high end experience that most rural schools in the area don’t have access to. The lobby trophy case, the reception desk, the laboratories and the library all got custom millwork that utilized the same materials to unify the school as a whole. Custom Info Placard Supply Detail

EXTERIOR DETAILS The building is cladded with juxtaposing materials such as three profiles of metal panel randomized to create texture, polycarbonate panels that creates a glowing presence on the exterior, and a massive gabion wall with stones hand-cut and placed by a local craftsman, paired with extruded steel elements like the canopy and the window boxes. The variety of materials required careful detailing and coordination with all the traits to get the look we were after. All the classrooms share two-story windows that are embedded in the metal panels strategically to break the pattern. From the interior each window frames the Ozark hills that surround the school. Library Exterior Gabion Wall + Exterior Classroom

ENGLAND ELEMENTARY ENGLAND, AR FIRM: MODUS STUDIO PROJECT TYPE: EDUCATION 64,251 SF BUILT 2021 AIA ARKANSAS MERIT AWARD WINNER 2023 RESPONSIBILITIES: • Researched and developed concept design • Managed team to ensure quality of deliverables • Reviewed design and construction documents • Interior way-finding and branding • Construction details • Millwork design • Renderings using Lumion • Client presentations • Construction Documents using Revit • Consultant Coordination 8 Main Drop-off Entry Conversation Stair- Lobby Bench + Mural- Lobby The town is intersected by hwy 165 and hwy 15, visually cutting the town. The school is only accessible through highway 15. The building wraps the existing driveway extending to the highway to serve as a welcome sign for the school. This rural school serves England AR and the surrounding towns. The school had a sprawling campus where kids had to travel between buildings to attend classes. They needed a centralized building to house the students and create a sense of identity. The new school was inspired by the surrounding conditions and the history of the town.

Aerial View

Second Floor First Floor FLORA The delta has an abundance of cypress swamps. This inspired the drop-off entry as a space to be amongst the trees. As well as a custom steel cut mural as a feature wall in the lobby. An important part of the project was creating spaces where kids could share ideas, and grow together. Any common area can become a classroom at a moment’s notice. Meeting areas like the gym, the cafeteria, the computer room and the outdoor classrooms were all designed to serve double purpose. The school is not only a place for kids to learn but is also a community space after hours. The spaces can be used for graduations, town meetings and work for fundraising and sports events celebrations. Drop-off Entry “Forest” Lobby Mural Swamp

US 165 EXISTING CAMPUS US 165 EXISTING CAMPUS US 165 EXISTING CAMPUS US 165 EXISTING CAMPUS 11 Early Iterations THE LAND England is located in the Arkansas Delta, a flat, fertile region along the Mississippi River. Historically the region’s main crops are cotton, soy and rice. Rivers and creeks are interrupted by farmland creating a texture resembling a quilt. The water acts as the stitches that keep the patches together. This phenomenon became a major source of inspiration for the concept of the project. Inspired by this condition the civil and landscape teams came up with a series of swales to manage flooding. Today they are used as an outdoor classroom with rain gardens and platforms for the students to study the water cycle and native plants. MASSING One volume sits on top of another, cantilevering to give refuge to the entries. This shaped the floor plan to have a central space. The lobby serves as the meeting point between the different rays of the building. On the exterior it creates several refuge areas for the entry ways that also serve as meeting spaces throughout the day. ITERATIONS This project was an iterative process. Many ideas were explored collaboratively within the team. Every day we would find new ways to improve the project by adding key details that added cohesiveness to the experience of the building.

Entry Canopy

OMAHA FEMA SHELTER OMAHA, AR FIRM: MODUS STUDIO PROJECT TYPE: EDUCATION 3,271 SF BUILT 2021 RESPONSIBILITIES: • Co-project manager • Consultant coordination • Construction drawings using Revit • FEMA research • Precast construction selection and coordination • Spec writing • Code research and coordination • Submittal and RFI management • Rendering using Lumion • Client presentations • Garden design This shelter was built using FEMA standards; it serves as a safe area for the school and community during extreme wind events. The building is located within the existing campus with a precast concrete structure, backlit steel canopy, and integrated signage. 13 Early Canopy Rendering Axon Entry Canopy Canopy Perforated Panels

School Spirit Back Entry + Axon Alumni Garden Rendering Alumni Garden Wall ALUMNI GARDEN The history of the school and the school spirit are points of great pride to this community. We wanted to celebrate them with a garden that acts as a courtyard tucked in surrounded by school buildings. We salvaged the river rock that enclosed the original 1953 gym for an alumni garden. We created an alumni wall and paved part of the garden using the salvaged river rock. The Garden serves as an outdoor classroom and as a space for students to hang out in between classes.

Interior- School Spirit Eagle Interior Rendering Floor Plan Acoustic Panel Layout 1" DARK GREY ACOUSTICAL PANEL, AP-1 2" LIGHT GREY ACOUSTICAL PANEL, AP-2 BACKSTOP CURTAIN, BC-1 RE: FINISH LEGEND 100C PRECAST CONCRETE DOUBLE TEES PAINTED P-1, RE: PRECASTER TO BOTTOM OF DOUBLE TEE 13' - 4" PRECAST CONCRETE CONTINUOUS SUPPORT, RE: PRECASTER L-1 LIGHTING FIXTURE, RE: ELECTRICAL HVAC EQUIPMENT, PAINT TO MATCH CEILING RE: MECHANICAL C-2 PRECAST CONCRETE WALL PAINTED P-1, RE: PRECASTER RESILIENT BASE RB-1 (09 65 13), RE: FINISH LEGEND 1/4" = 1'-0" D1 A1.10 A1 INT. ELEVATION - SAFE ROOM EAST A2.00 B1 A2.00 A1 A2.00 B3 A5.30 D4 D3 A2.00 A3 B3 A3.00 A3 A3.00 A5.30 D1 C3 A1 C1 B1 A3.00 A5.20 B3 A1 A3.00 EC01 EC01 EC01 8' - 0" 72' - 0" 100B 100C 4' - 0" 80' - 0" 4' - 0" 45' - 0" 3' - 0" COURT MARKINGS. DARK GREY CONCRETE STAIN (09 93 23). COORDINATE FINAL PATTERN WITH ARCHITECT 13' - 6" A5.30C4 BACKSTOP CURTAIN, BC-1 RE: FINISH LEGEND 156 SF MEP ROOM 103 191 SF MEN RR 102 189 SF WOMEN RR 101 3271 SF SAFE AREA 100 EXISTING BUILDING A4.00 A1 A4.00 A2 A4.00 C3 8' - 0" STEEL AWNING ABOVE RE: A1.90 STEEL AWNING ABOVE RE: A5.22 13' - 0" 42' - 0" 55' - 0" EC01 EC01 FIRE EXTINGUISHER FE-1 103A 101A 102A 55' - 0" 100A 8' - 0" 120 SF GASKET 105 EM01 EW01 EW01 A4.00 C2 3' - 6" 3' - 5" 2' - 7" EM01 EM01 C4 A3.00 9' - 6" NEW HVAC UNIT, RE: MECHANICAL 99' - 11 1/2" 99' - 11 1/2" 100' - 0" IM02 IM01 IM01 100' - 0" METAL PANEL MP-2 (07 42 13), RE: EXTERIOR FINISH LEGEND 12' - 1" 43' - 5" 3' - 11 3/4" 6' - 4" STEEL WHEEL STOP RE: G0.05 NEW GREY PARKING LOT STRIPING MP-3 AND SIGNAGE. RE:A7.01 4' - 0" 6' - 4" 2' - 8" 34' - 0" 8' - 0" 1' - 0" 8' - 0" 1' - 0" 8' - 0" 1' - 0" 8' - 0" MOP SINK, RE: PLUMBING 8" CONNECTION OF PRECAST DOUBLE TEE ROOF MEMBERS TO PRECASTER CONNECTION OF PRECAST DOUBLE TEE ROOF MEMBERS TO PRECASTER 5' - 6" METAL DOWNSPOUT (07 62 00) METAL PANEL MP-2 (07 42 13), RE: EXTERIOR FINISH LEGEND METAL PANEL MP-2 (07 42 13), RE: EXTERIOR FINISH LEGEND METAL PANEL MP-2 (07 42 13), RE: EXTERIOR FINISH LEGEND 150 SF HALLWAY 104 NEW WALL FRAMING TO BE ATTACHED TO EXISTING SLAB BELOW AND TRUSSES ABOVE. INTERIOR DETAILS The building interior was kept with the exposed structure to celebrate the function of its parts. It became a teaching moment for all the kids and the community. We wanted to integrate the school mascot into the design, which is something the school is very proud of. With acoustic panels we created a 3D graphic to serve a dual purpose: reduce noise and bring school spirit. MULTIPURPOSE SPACE During regular school hours the FEMA shelter serves as an indoor range for the archery teams. This required a lot of material and safety research and coordination with the teachers and the contractor.

VOLARE CAP CANA, DOMINICAN REPUBLIC FIRM: ATELIER REACH PROJECT TYPE: MULTIFAMILY 115,550 SF UNDER CONSTRUCTION RESPONSIBILITIES: • Project manager • Construction drawings using ArchiCAD • Circulation/ parking design • Units layouts and documentation • Consultant coordination • Amenity spaces design and coordination • Client presentations 16 Aerial Rendering Pool Area Rendering Unit Rendering This project has 112 condo units spread across 4 four stories. The building sits over an underground parking level. Each unit has a beautiful view of the golf course, adjacent parks or the sea, which can all be enjoyed from the balconies or penthouse patios. The roof of the project is divided into private patios that every tenant has access to. The project has a central pool, a gym, grill areas, office spaces, and a conference room, storage units, and golf cart parking.

Main Entry Rendering

Early Campus Rendering

FAYETTEVILLE, AR FIRM: MODUS STUDIO PROJECT TYPE: MULTIFAMILY 9 ACRES BUILT 2025 DIGSAU’s winning entry in the Housing Northwest Arkansas International Design Competition in 2018. Platform During Construction Porches RESPONSIBILITIES: • Building layout • Code compliance • Unit layout and distribution • Built-in design • Interior details • Amenity space design • Material research • Client presentations • Construction documents using Revit • Renderings using Lumion Town Branch Apartments is a nine-acre, 360- unit complex with multiple living and working options. Multiple scales of buildings coexist together, melding the new development into the surrounding neighborhood fabric. Bike and pedestrian routes are intertwined throughout the site, providing connectivity to open space, amenities, and the surrounding neighborhood. Parking is under a concrete podium with a roof that doubles as a flexible landscape for outdoor events and activities. TOWN BRANCH

E E E E E E E E E E E STOP VAN VAN ROOF DECK AMENITY BELOW, SEE BUILDING PLANS ROOF DECK AMENITY BELOW, SEE BUILDING PLANS ROOF DECK AMENITY BELOW, SEE BUILDING PLANS ROOF DECK AMENITY BELOW, SEE BUILDING PLANS ZONE 3 ZONE 4 4.01 XS 4.02 S3 4.03 M ZONE 1 ZONE 2 1.01 XS LIFT 1.02 XS 1.03 L5+M3 1.05 XL+M 1.06 S5 LIFT 1.07 XS LIFT 1.08 M LIFT 1.09 XS 1.11 XL+M 1.12 XS 1.13 S3 2.01 S5 2.02 XS 2.03 L5+M2 2.05 S5 2.06 L5+M2 1.04 S5 3.02 M 3.03 L4 3.04 L4 3.05 M 3.06 S5 3.07 M 20 Unit Samples S M L XL Building Type Full Campus Buildings and Units The design was composed of 26 unit types spread across 5 building types. The overall site included a total of 25 buildings connected by podium parks and a trail. Some of the buildings were mirrored, resulting in mirrored drawings of some of the units and extra coordination with all the consultants. The project included studio apartments, lofts, 1-3 bedrooms and penthouses with rooftop garden spaces. I designed 4 kitchen types with mirrored options and was responsible for the design of all custom cabinetry and built- in millwork for the apartments.

Bedroom Rendering Construction Image: Stairs Exterior Treatment

NABHOLZ OFFICE ROGERS, AR FIRM: MODUS STUDIO PROJECT TYPE: COMMERCIAL 7,500 SF BUILT 2022 DETAILS This project was detail driven. Every connection and surface was thought out to generate warmth and harmony. The slat concrete wall and the metal panel cladding grounded the building with texture. While the CLT panels and columns lifted the interior making the space feel light. RESPONSIBILITIES: • Co-project manager • Construction documents using Revit • Facade studies • Construction details design and coordination • Opening design and detailing • Consultant coordination • CLT research and coordination • Millwork design • Renderings using Lumion • Client presentations • Submittal and RFI management • Attending AOC meetings The NWA Nabholz office needed an addition to house their growing team. They desired a space where teams could integrate. The addition has an open office concept with CLT structure and DIRTT wall systems to visually open the space for collaboration to happen. Night View- Entry Side Concrete Detail Column Detail

Entry

FACADE STUDY Playing with three distinct aluminum panels I created four standard rhythms that would alternate on the facade to make the facade dynamic and unpredictable. From there each facade had a recipe and a particular order unnoticeable to the naked eye. This template streamlined communication with the contractor and the panel vendor.

1/4" ROLLED STEEL PLATE. CONTINUOUS WELD + SANDED SMOOTH. PAINT BLACK A4.10 E3 A4.10 C3 EXPOSED CLT PANEL. RE: STRUCT. MASS TIMBER STRUCTURE. RE: STRUCT. 20 GAUGE SHEET METAL PARAPET CAP TO MATCH METAL WALL PANEL TPO MEMBRANE ROOFING - WHITE FIBERGLASS MAT GYPSUM SHEATHING, 1/2" METAL STUDS, 6" FIBERGLASS MAT GYPSUM SHEATHING, 1/2" 1 1/2" RIGID INSULATION FLUID APPLIED WEATHER-BARRIER METAL WALL PANEL, MP-1 SSG ALUMINUM STOREFRONT SYSTEM, GW-1 CONCRETE SLAB, RE: STRUCT. CONCRETE FOOTING, RE: STRUCT. UNDER-SLAB VAPOR RETARDER MEMBRANE UNDER-SLAB VAPOR RETARDER MEMBRANE 1/2" RECOVERY BOARD SLOTTED DRAIN TILE GLUELAM COLUMN, RE: STRUCTURAL CONCRETE SIDEWALK, RE: CIVIL TPO MEMBRANE ROOFING - WHITE GLASS FIBER BLANKET INSULATION STEEL BEAM HEADER, RE: STRUCTURAL 1/4" X 1-1/2" STEEL FLAT BAR STIFFENERS, PAINT TO MATCH LIGHT GAUGE METAL "Z" FURRING 25 Wall Section- Entry Awning Conference Room Lobby Open Office Space CLT Connection Patio

Entry Existing

PALMAS 79 CAP CANA FIRM: ACCOM PROJECT TYPE: HIGH END RESIDENTIAL RENOVATION 7,427 SF UNDER CONSTRUCTION RESPONSIBILITIES: • Lead designer • Project manager • Construction documents using Revit • Furniture selection • Finish selection • Kitchen equipment selection • Pool design • Renderings using Lumion • Client meetings • Consultant coordination The client contacted us to renovate their vacation home. They wanted to create a space where their family and friends could enjoy the resort life. This project required a complete interior and exterior renovation to accomplish the clients needs. The renovation included a new bedroom, complete pool area renovation, a hot kitchen addition, cold kitchen design, new family room and a complete master bedroom redesign. They wanted the tropical feel of a beach house with elevated finishes. 27 Living Room Foyer Pool Area + Gazebo TV Room Office Cold Kitchen + Dining Room RENOVATION The existing interior had black storefronts separating the rooms. We removed the dividers to integrate the space and added different textures to the walls to break the monotony and create hierarchy. The exterior lacked warmth and character. We redid the driveway and landscape, reenvisioned the facade, added a car port for the golf carts and included a water feature with a tree to create visual impact.

CALETON 99 CAP CANA, DOMINICAN REPUBLIC FIRM: ACCOM PROJECT TYPE: HIGH END RESIDENTIAL 8,870 SF UNBUILT 28 Kitchen Back Elevation Master Bedroom RESPONSIBILITIES: • Lead architect • Project manager • Construction documents using ArchiCAD • Furniture selection • Finish selection • Kitchen equipment selection • Pool design • Renderings using Lumion • Client meetings • Consultant coordination • Budgeting This property overlooks Cap Cana’s Farallón. The dramatic 328-meter-high bluff serves as a backdrop to the single family home. The focus of the project was to maximize moments of connection. The home has 4 bedrooms, 4.5 baths, a family room, a gym, an office and an open concept kitchen-dining-living room connected to a large terrace and pool area with an ample backyard that bring the family together. A new build home for a family of 4. The clients moved to the Dominican Republic to start a new chapter. They were looking for a place to call home where their two daughters could grow up. They wanted spaces that felt homey and welcoming. As a young couple they love hosting and cooking for their guests. The kitchen was a big element of the design to host friends and create family memories.

Entry Rendering

S\N DN fo dm wees ay Wo TP Sl os |e 7h i 2 y ia { == oy Net [I f5 a. ENED = Fis Wal HED =e pA mr Ti RELL = Ip% 1 rl] t | | Hl SR oT 4 A i h Pl BT } | 7 ZN, 5 il 1 ( LL PAE HA af Ea aed 2 ee gees (d= ae) 1 QE TENT . 30 EE "

SKETCHES

FABRICATION FUZZY Fuzzy was a temporary installation at Drury University. Made from discarded printing paper tubes cut to 2” segments and zip ties as a commentary of the wasteful practices of architecture schools and the industry. The cavities were brought to life with two colored lightbulbs. It created a meditative space for students to hang out in between classes.

TESSALATIONS BOX This project was created using Rhino and Grasshopper as part of a class. Then fabricated using a laser cutter and 3D printer. The box was designed as a tessellation cut in one piece while the goal for the object was to create the thinnest 3D print that would be structural and translucent.