80 DESIGN AND MAINTENANCE TABLE OF CONTENTS 1. Interdisciplinary Team ................................................................................................................... 81 2. Planning P ....................................................................................................................................... 84 3. Designing the Surgical Suite P ..................................................................................................... 97 4. Renovation and Technology Updates ......................................................................................... 112 5. Construction-Related Environmental Contamination ............................................................. 113 6. Preoperative Area ......................................................................................................................... 114 7. Operating Rooms .......................................................................................................................... 115 8. Hybrid OR ....................................................................................................................................... 118 9. Procedure Rooms .......................................................................................................................... 120 10. Postoperative Areas ................................................................................................................... 121 11. Sterile Processing Areas ............................................................................................................. 121 12. Support Areas .............................................................................................................................. 124 13. OR Maintenance ......................................................................................................................... 126 14. Utility and HVAC Disruption ...................................................................................................... 130 MEDICAL ABBREVIATIONS & ACRONYMS AAAHC – Accreditation Association for Ambulatory Health Care ACH – Air changes per hour ACR – American College of Radiology ANSI – American National Standards Institute APIC – Association for Professionals in Infection Control and Epidemiology ASC – Ambulatory surgery center ASHE – American Society for Healthcare Engineering ASHRAE – American Society of Heating, Refrigerating and Air-Conditioning Engineers CDC – Centers for Disease Control and Prevention CFU – Colony forming units CMS – Centers for Medicare and Medicaid Services CT – Computed tomography DICOM – Digital Imaging and Communications in Medicine DNV – Det Norske Veritas EPA – Environmental Protection Agency ERAS – Enhanced Recovery After Surgery FD – Flow disrupter FGI – Facility Guidelines Institute GFCI – Ground fault circuit interrupter HCO – Health care organization HEPA – High-efficiency particulate air HVAC – Heating, ventilation, and air conditioning IAHSS – International Association for Healthcare Security & Safety ICRA – Infection control risk assessment iCT – Intraoperative computed tomography IES – Illuminating Engineering Society IFU – Instructions for use ISO – International Organization for Standardization LAF – Laminar air flow LED – Light-emitting diode LEED – Leadership in Energy and Environmental Design LGBTQ – Lesbian, gay, bisexual, transsexual, queer MERV – Minimum efficiency reporting values MR – Magnetic resonance MRSA – Methicillin-resistance Staphylococcus aureus NFPA – National Fire Protection Association OR – Operating room OSHA – Occupational Safety and Health Administration PACU – Postanesthesia care unit PM – Particulate matter PPE – Personal protective equipment RN – Registered nurse SPD – Sterile processing department SRA – Safety risk assessment SSI – Surgical site infection TCAB – Transforming Care at the Bedside TcAF – Temperature-controlled air flow UVC – Ultraviolet-C VR – Virtual reality P indicates a recommendation or evidence relevant to pediatric care. I-03_DesignMaint-25_110124.indd 80 I-03_DesignMaint-25_110124.indd 80 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

DESIGN AND MAINTENANCE 81 T he Guideline for Design and Maintenance of the Sur- gical Suite was approved by the AORN Guidelines Advisory Board and became effective as of July 20, 2023. Information about the systematic review supporting this guideline, including the PROSPERO registration num- ber, systematic review questions, description of the search strategy and evidence review, PRISMA 2020 flow diagram, evidence rating model, and evidence summary table is available at https://www.aorn.org/evidencetables/. Purpose The physical design of the surgical suite should support safe patient care, efficient movement of patients and sup- plies, and workplace safety and security. The surgical suite includes the preoperative, intraoperative, and postopera- tive patient care areas and support areas, including central and satellite sterile processing areas, administrative areas, waiting areas, and staff areas. This document provides guidance on the design layout and equipment used in the surgical suite and maintenance of these spaces, as well as recommendations for functionality, energy and cost effi- ciency, workflow, and emergency measures; physical secu- rity measures; considerations and safety measures for new construction or renovation of the surgical suite; planning for unintended utility service interruptions; restoration of the surgical suite to full functionality; maintenance of structural surfaces; and the design, monitoring, and main- tenance of the heating, ventilation, and air conditioning (HVAC) system. The following topics are outside the scope of this document: • use of portable/robotic room decontamination equipment (See the AORN Guideline for Environmental Cleaning1); • pathogen-specific (eg, SARS-CoV-2) infection prevention controls; • management of movable medical devices used in the oper- ating room (OR) (eg, bar coding; heater-cooler units [See the AORN Guideline for Sterile Technique2]); • forced-air warming devices [See the AORN Guideline for Prevention of Hypothermia3]); • accommodations for persons with disabilities; • workflow design and personnel preparation for a natural disaster or other emergency (eg, an active shooter); • general interior design concepts (eg, colors, furniture, cabinetry); • control of surgical smoke (See the AORN Guideline for Sur- gical Smoke Safety4); and • security of health information technology, including tele- health, patient-monitored technology (eg, ambient intelligence), and paper and electronic health records (See the AORN Guideline for Patient Information Management5). 1. Interdisciplinary Team 1.1 Convene an interdisciplinary team with authority and responsibility to provide oversight of con- struction and renovation projects in the periopera- tive area.1-16 [Recommendation] An interdisciplinary team can provide expertise on functional design, the functional needs of users, infec- tion prevention, sustainability, and regulatory require- ments from a variety of perspectives from develop- ment through implementation.1-16 Low-quality evidence13-16 and guidance from the Facility Guidelines Institute (FGI)10,11 support the for- mation of an interdisciplinary team that is specific to the scope and nature of the design project. The evi- dence also supports convening this interdisciplinary team as early as possible in the project. 1.2 The interdisciplinary team should include • administrators; • internal representatives of the health care organization, including ◦clinicians from services affected by the project: ▪perioperative registered nurses (RNs) with the responsibility and authority to repre- sent the perioperative team (eg, periop- erative RN leaders), ▪surgeons, ▪anesthesia professionals, ▪perioperative RNs with expertise in all phases of preoperative and postoperative (phase I and phase II) nursing care, ▪surgical technologists, ▪infection preventionists; ◦support personnel affected by the project: ▪sterile processing personnel, ▪environmental services personnel; • representatives of manufacturers whose equip- ment requires provisions for structural sup- port, space, and utilities17; • clinicians from other affected services as deter- mined by the scope of the project (eg, phar- macy, radiology, laboratory, perfusion services, interventional cardiology)17; and 2025 Guidelines for Perioperative Practice Last revised: July 2023. Copyright © 2025 AORN, Inc. All rights reserved. GUIDELINE FOR DESIGN AND MAINTENANCE OF THE SURGICAL SUITE I-03_DesignMaint-25_110124.indd 81 I-03_DesignMaint-25_110124.indd 81 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

82 DESIGN AND MAINTENANCE • additional representatives who may be from outside the organization: ◦architects, ◦interior designers, ◦construction project managers, ◦construction engineers, ◦industrial hygienists, ◦subcontractors (eg, electricians, plumbers, HVAC professionals), ◦facility managers, ◦environmental/occupational health/safety specialists (eg, ergonomics, acoustics), ◦security specialists, and ◦information technology specialists. [Recommendation] Although the perspectives of frontline surgical suite staff, including the perioperative RN, are essen- tial to the workflow design of the new space, it is equally imperative that those with decision-making authority and insight are present. Low-quality evidence8,9,13,16-20 and FGI guidance10,11 support the creation of an interdisciplinary team that consists of key stakeholders, including infection preventionists. Al-Benna8 discussed that infection preventionists are imperative to the design process from the begin- ning of planning of new construction and renovation projects so that infection prevention interventions can be designed into the space. Personnel from other disciplines can be added for decisions related to their work. For example, during hybrid OR design, radiology RNs, radiology techni- cians, interventional radiologists, interventional car- diologists, perfusionists, and consultants for acoustics and vibrations can provide valuable information.17 Input from interdisciplinary stakeholders provides relevant perspectives for designing the space that best meets current needs and considerations for the future use of the new construction or renovation project.10 Each stakeholder brings expertise and knowledge about their discipline’s clinical and operational needs, applicable regulatory requirements (eg, Centers for Medicare and Medicaid Services [CMS]), and applica- ble accreditation body expectations (eg, The Joint Commission, Det Norske Veritas [DNV], Accreditation Association for Ambulatory Health Care [AAAHC]). 1.2.1 Additional stakeholders may include • patient advocates, • accident and emergency consultants (eg, emergency management professionals), • construction specialists, • maintenance staff, • performance and quality improvement personnel, • legal team members (eg, risk managers, legal experts), • commissioning agents, • design framework facilitators (eg, Lean project specialists), and • human factors/ergonomics specialists/ engineers.8-11,13,17-20 [Conditional Recommendation] Specific external stakeholders can provide their expertise when the need arises. Patient advocates can provide insight about how to best serve the anticipated patient population. For example, Calvert et al20 described the use of patient shad- owing (eg, observing a person’s experience and interactions) of the specific patient population to determine their perception of the surgical suite. Stichler13 suggests that while most health care organizations have resources necessary inter- nally to manage construction projects, there can be a need to include the expertise of exter- nal consultants to fill any gaps during multiple phases of design and construction. During the preplanning phase, this may include consultants to create the vision for the project, define criti- cal success factors, identify financial concerns, evaluate information technology systems, pro- vide community demographics, handle contrac- tual relationships with payers and vendors, and implement marketing and communications. A professional who conceptualizes the exterior design features important for communicating the organization’s image to the community can develop the design. Medical equipment planners can optimize the square footage dimensions. Cost estimators or construction managers can manage all costs related to the project. Move consultants can negotiate the details of the move from an existing service location to the new or renovated space. Transition planning consul- tants focus on changes in care delivery processes during and after project completion, and cultural transformation consultants focus on staff mem- bers’ internalization of the construction vision. 1.3 The interdisciplinary team should participate in all phases of the new construction or renovation project including scope development, budgeting, planning, design, construction, commissioning, and plans for maintenance of the space.10,11,19,21-23 [Recommendation] Low-quality evidence8,19,21-23 and FGI guidance10,11 support team involvement during all phases of the project. 1.3.1 Evidence-based perioperative design tools may be used to augment interdisciplinary team I-03_DesignMaint-25_110124.indd 82 I-03_DesignMaint-25_110124.indd 82 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

83 DESIGN AND MAINTENANCE collaboration during all phases of the con- struction or renovation project. [Conditional Recommendation] Evidence-based tools can provide a platform that bolsters interdisciplinary team collaboration by focusing the team on design elements that are essential to creating ergonomically functional perioperative spaces. An example of this is the Safe OR Design Tool created at Clemson University as part of an Agency for Healthcare Research and Quality–funded Patient Safety Learning Lab titled Realizing Improved Patient Care through Human- Centered Design in the Operating Room.24 1.4 Perioperative RNs who serve on the design team should provide input on all aspects of construc- tion and renovation projects from planning through commissioning of the finished periopera- tive space.9,25-27 [Recommendation] The perioperative RN can communicate staff and patient needs before design plans are proposed and give feedback during design optimization that can reduce potential workflow inefficiencies when a surgical suite is constructed or renovated (eg, the ability of the RN to see the sterile field during pro- cedures). If the organization has access to a periop- erative RN with an architecture background, this dual expertise can serve to bridge communication between designers and clinicians. The perioperative RN can speak to the function of the space and provide recommendations to the interdisciplinary team to integrate expertise for an optimal and safe surgical suite. The RN can envision how systems and processes will function and pro- vide recommendations for design that promote security, safety, and communication during periop- erative patient care, including the ergonomics and acoustics of the workspace. Low-quality evidence9,25,26 and an American Nurses Association publication27 support RNs’ involvement in the design of their work environment. In a litera- ture review of 25 articles, Stichler26 concluded that gaining the perspective of experienced and espe- cially aging RNs can support effective design of the care environment and workflows and provide insight about needs for safety, visual acuity, and efficiency of the aging nursing workforce. Devine et al9 used the Transforming Care at the Bedside (TCAB) principles to design the renovation and expansion of one hospital. The authors describe the use of an expert clinical nurse as facil- ity nurse project manager as a liaison between the design team, architects, facilities, and design con- sultants. The RN advocated for the team’s recom- mendations among constituent groups and pro- vided a perspective on the feasibility of any issues, while being mindful of the budget. The researchers concluded that the success of the project was based on initiating a core team early, having small teams for specific functional issues, and having the RN liaison to advocate for feasible, evidence-based decisions when the staff and design team choices did not align. 1.4.1 The perioperative RN should • provide input into ◦the selection of equipment, ◦the proposed flow of people, supplies, and equipment, ◦space utilization, and ◦components of a healthy work environ- ment (eg, ergonomic safety, acoustics); • verify the presence and integrity of con- struction barriers and infection prevention measures in the perioperative space while the construction project is underway; • participate in construction meetings; • monitor the progress of the project through visual inspection; • communicate to the perioperative team the progress of the project and information that will affect the daily functions of the surgical suite (eg, the presence of new bar- riers, additional cleaning required, noise and vibration that will be caused by the construction); • communicate relevant clinical information (eg, patient transport flows, hours of opera- tion, critical hours for noise suppression) to construction project managers; • collaborate with all stakeholders; • collaborate with perioperative team mem- bers to resolve unanticipated problems as they arise during the construction process; and • verify that the components required in an OR (eg equipment, utilities, documentation space, storage) are present in the simulated OR. [Recommendation] 1.5 The interdisciplinary team should determine the policies and procedures associated with the con- struction, renovation, maintenance, and pre- dicted upgrades of all elements related to the design of the surgical suite (eg, workflow, equip- ment, infrastructure) using any applicable regu- lations, guidelines, evidence, tools,24 and equip- ment manufacturers’ instructions for use (IFU). [Recommendation] I-03_DesignMaint-25_110124.indd 83 I-03_DesignMaint-25_110124.indd 83 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

84 DESIGN AND MAINTENANCE 1.6 The interdisciplinary team should provide educa- tion on the use of new or remodeled spaces to all stakeholders who will use the space to participate in patient care (eg, clinicians, support staff, mate- rials management personnel). [Recommendation] Education is essential for personnel who will work in and maintain the surgical suite, equipment, and infrastructure during the project and after its completion. 1.6.1 Include the following in the education plan: • location of emergency exits; • location and use of electrical outlets, medi- cal gas outlets, and other utilities; • location and safe use of equipment and sup- plies; and • movement of patients, personnel, supplies, and equipment through the facility. [Recommendation] 2. Planning 2.1 New construction and renovation projects in peri- operative areas must be compliant with applicable local, state, and federal regulations.28,29 [Regulatory Requirement] Additional guidance from state and local regula- tors is specific to the location of the new construc- tion and renovation project. 2.1.1 Review federal regulatory requirements and guidance, including • Conditions of Participation for Hospitals,28 • Occupational Safety and Health Adminis- tration (OSHA) guidelines and tools,30-33 and • the CMS Ambulatory Surgery Centers (ASC) State Operations Manual.29 [Recommenation] 2.1.2 Also review guidance from the • National Fire Protection Association (NFPA)34-39; • FGI10,11; • American Society for Healthcare Engineer- ing (ASHE)40-48; and • American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE).49-51 [Recommendation] These documents, which are compiled by expert consensus panels, are frequently refer- enced in regulatory requirements. Reviewing these documents can inform teams that par- ticipate in the design, construction, and mainte- nance of the perioperative suite of best practices. 2.2 Planning the design of construction and renova- tion projects should include consideration for future needs of the space.21,52 [Recommendation] Low-quality evidence supports considering the future needs of the space while planning construc- tion and renovation projects.21,52 In 2022, Memari et al21 conducted a literature review to consolidate what is known about the important issue of future proofing in hospital design and to offer a definition of future proofing based on the literature. The researchers found no consistent definition in the literature but did offer a model for future proofing in hospital building projects that includes the interplay of influential factors of the design, planning objectives, and capabilities in design solutions. The researchers found six catego- ries of future-proofing capabilities in hospital design: maintainability, resilience, changeability, mitigation, improvement, and transition. The researchers con- cluded that the definition of future proofing should not be limited to crisis-driven (reactive) approaches, which relate to resilience and changeability, but rather, the definition should address both reactive and proactive approaches during the building life cycle. The researchers emphasized the importance of the interdisciplinary approach and systematic perspective in hospital design and future proofing. In 2021, Pilosof52 compared two hospital architec- tural design strategies, one for a specific medical function and one for unknown function. The author found that a design for a specific function limited changes during the design process, construction, and occupancy phases. However, a systematic design for an unknown function allowed for a variety of changes, which positively influenced the evolution of the facility. The authors found that the facility that was designed for unknown function was able to accommodate future functional changes, including a horizontal-oriented evolution (eg, having adjacent horizontal space left undeveloped that facilitated easy changes for unit sizes and forms as the hospital grew). The authors found that health care policies, organizational culture, and infrastructure funding models influenced the results of the project as well. 2.3 Review evidence-based design concepts (eg, frame- work, simulation) in the design of new construction or renovation projects, including areas specific to perioperative care in inpatient and outpatient areas (ie, preoperative areas, ORs, hybrid ORs, pro- cedural areas, postoperative areas, support areas, sterile processing areas).28 [Recommendation] P Reviewing the most up-to-date evidence can facili- tate a smoother construction or renovation project that also aligns with regulatory requirements. Elements of I-03_DesignMaint-25_110124.indd 84 I-03_DesignMaint-25_110124.indd 84 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

85 DESIGN AND MAINTENANCE evidence-based design recommendations found in the literature for this guideline included • acoustics; • sustainability; • wayfinding; • emergency preparedness and management; • palliative care setting design considerations10; and • patient-centered considerations, such as the ergo- nomic workflow for specific patient populations (eg, high acuity, bariatric, pediatric).53-55 However, there are some limitations to the litera- ture, and additional research is warranted. For instance, in 2022, Simonsen et al56 conducted a scop- ing review of healing architecture in health care and found seven articles related to the characteristics of healing architecture and practices. The researchers reported two main findings: no common or opera- tive definition of healing architecture and limited knowledge of its effect on clinical and patient out- comes, as no architectural property was deemed essential for a healing design or definitely linked to specific health outcomes. The researchers concluded that additional research is needed to inform design and guide post-occupancy evaluations of purpose- built sites. Moderate-quality14,52,57,58 to low-quality59-66 evi- dence and FGI guidance10 support a variety of meth- odologies for designing and constructing a health care environment,65 including simulation and mock ups,57 specific frameworks,59-63,66 and functionality52,58 related to specific outcomes (eg, communication,14 job satisfaction, patients’ stress, patient’s satisfac- tion, falls).64 Brambilla et al64 conducted a literature review of 35 peer reviewed papers about the effect of evidence- based hospital design on hospital occupants’ and organizational outcomes. The researchers found that the visual, audio, and patient room design affected 69% of the outcomes studied: staff job satisfaction (n = 11), patients’ stress reduction (n = 9), patients’ satis- faction (n = 6), and patients’ fall reduction (n = 6). The authors concluded that the variability and limitations of the studies reduced the ability to make compari- sons and recommended that additional research be conducted. The use of frameworks that focus on different aspects of design and maintenance of health care facilities has been studied in the design of the health care setting. Although there is no consensus on the most efficacious framework for health care design and additional research is warranted,60 researchers have found that using a framework can provide structure to the process,59,60,62,63,66 influence outcomes such as patient and staff satisfaction,62,64 and limit workflow disruptions.67 Zadeh et al67 analyzed six case reports of successful facility design to create a framework using economic tools and operational successes to communicate return on investment of evidence-based design in health care. The researchers found that the cost of implementing evidence-based design, the long-term financial benefits, internal rates of return, and pay- back periods (ie, the period of time required to recover the cost) were worth the investment. The researchers concluded that frameworks to compare outcome costs with initial costs could communicate life cycle costs and savings to stakeholders. None of the included studies were conducted in the periopera- tive setting; however, the structured framework to evaluate return on investment by analyzing improve- ments in patient outcomes (eg, decreased falls relative to room design, reduced number of health care– associated infections in the inpatient setting) and avoidance of staff injuries (eg, reduced number of musculoskeletal injuries when investments were made in patient lift infrastructure and equipment) could be applied to the perioperative setting. Two researchers used frameworks specifically for perioperative suite design including a structured technique to solve complex multicriteria decision- making problems (ie, fuzzy analytics) and human- centered design, which allowed researchers to opti- mize the design based on the staff’s workflow.12,61 Lin and Wang61 described using a human reliabil- ity tool and the fuzzy analytic hierarchy process (ie, processing uncertain variables to solve complex multi-criteria-decision-making problems) to opti- mize OR layout design. Field investigations are used to develop a layout scheme that is categorized into human reliability analysis as software, hardware, environment, or liveware (ie, human elements such as teamwork, communication, leadership). Then the fuzzy analytics are used to compare the layouts based on the categories. The authors concluded that suitable layouts meet strategies and goals of the sys- tem as well as the safety, security, and reliability goals of the system. Criscitelli and Goodwin12 described the application of human-centered design thinking for health care. Human-centered design thinking is a process of creat- ing solutions to complex problems for specific user groups based on need finding (ie, discovering the users’ needs), creating, thinking, and doing. The authors described several applications to the health care setting and provided an example of a smart OR that includes bright vision rooms with floors and walls used to com- municate and organize activities in the room (eg, illu- minating where equipment should be for a specific sur- geon and surgical procedure); floors that change color based on cleanliness; monitors of patient information whose placement is controlled by the surgeon, who can I-03_DesignMaint-25_110124.indd 85 I-03_DesignMaint-25_110124.indd 85 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

86 DESIGN AND MAINTENANCE also bring up an image of the instrument requested; and a sterile field that shows the setup and instruments required and tracks surgeon use of instruments. 2.4 During the surgical suite planning and design phase, review workflows in the current periopera- tive suite or a simulated room or suite setup.58,68-75 [Recommendation] P Moderate-quality58,68-73 and low-quality74,75 evi- dence supports using simulation specifically for workflow related to the layout of the surgical suite to optimize team communication and patient safety and to minimize workflow disruptions, including in the ambulatory setting.74 Observation, simulation, and virtual reality mock- ups can provide valuable information to the design team as the perioperative team previews what the optimal workflow would be after the design project is completed. Individual care providers (eg, physi- cians, nurses, ancillary staff members) can move through a simulation of their clinical practice areas58 and identify which layouts and configurations work best, including equipment and door placement, size of the rooms, and traffic and equipment flow pat- terns. Simulation and mockups (eg, life-sized mod- els,6,57 computer simulation76) in the perioperative suite can provide valuable information to influence the design of the perioperative suite layout to increase the efficacy of staff workflow and patient safety. Machry et al58 used flow mapping before and during the design team visit to help inform the pro- cess. The team incorporated existing staff flow determined via interviews and then used design sim- ulations to determine the optimization and renova- tion of the health care space with staff input. Additionally, researchers have used working observation to optimize OR design,77-80 such as con- siderations for aging staff and other considerations for staff ergonomics, well-being, and safety, and sim- ulation and mockups for improvements to workflow, including the current layout and workflow disrup- tions that could be improved.6,57,76-82 Luo et al69 mapped movement trajectories using zone position systems during specific procedures to identify ineffi- cient use of space and to determine the optimal lay- out for those procedures. Zook et al74 also reviewed the literature with a floorplan layout analysis case study to determine the workflow in ambulatory care center layouts, including center-stage layouts (ie, all patient rooms center around one staff workroom and patient entrances) and onstage-offstage layouts (ie, patient and staff entrances to patient rooms are opposite into separate corridors). The authors concluded that variations of both layouts can reduce the negative effects of each and create functional zones that benefit health care processes, outcomes, and patient-centeredness while supporting the providers’ teamwork as well as giving providers privacy. Torres-Landa et al57 interviewed 193 interdisci- plinary medical professionals in an interactive ses- sion to evaluate Styrofoam life-sized models of the perioperative suite. Then, 134 professionals evalu- ated the reconstruction efforts from the first round. The researchers found that there were significantly higher design satisfaction scores for round two than round one, which may be related to the significant changes that were made based on the original evalu- ation. The researchers concluded that simulations and interactive sessions are valuable for gaining feedback before move-in after construction is completed. Pelly et al6 observed the influence of integrated facility design on the functionality of a pediatric ASC. This integrated facility design process is a process adapted from the Toyota 3P Program with a goal of accelerating development time and lowering startup costs through production, preparation, and process. The design core team and facilities core team collab- orated on mockups and simulations for the facility’s faculty, staff, and families to provide feedback on seven areas of flow (ie, patients, families, providers, medications, supplies, equipment, information). The feedback was used to create full-scale mockups for operational testing and to evaluate anticipated workflow and actual costs. The researchers found that use of the integrated facility design process improved patient, family, and provider flow; reduced surgical and postanesthesia care unit (PACU) times; and reduced building space and change orders, lead- ing to a savings of $30 million in the planned cost of the entire building compared to similar projects in which traditional design methods were used. Observation of personnel workflow before con- struction or renovation projects also has influenced the design of the perioperative suite by showing workflow dysregulation,76,81,83 where workflow distur- bances occurred and a change in the design and lay- out was warranted77-81 and could be changed before construction began.81 Shultz et al72 conducted simulations to evaluate a proposed universal renovation design for 28 ORs. The researchers analyzed bumps and congestions of per- sonnel and equipment during videos of three scenar- ios, which resulted in recommendations that included relocating doors, booms, equipment, and supplies and reconfiguring workstations. The researchers con- cluded that the design changes implemented ulti- mately resulted in better room utilization, decreased congestion that negatively affected workflow, and enhanced access to equipment. I-03_DesignMaint-25_110124.indd 86 I-03_DesignMaint-25_110124.indd 86 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

87 DESIGN AND MAINTENANCE Joseph et al81 used interviews, surveys, and obser- vations to compare user evaluations of the mock-up OR with the post-occupancy newly built OR. The researchers analyzed workflow disruptions in pedi- atric surgery simulations and during five live pediat- ric procedures and concluded that simulation-based evaluations are beneficial to address concerns before construction occurs. Taaffe et al76 used computer simulation modeling with historical data based on 23 live-surgery video observations to analyze traffic flow inside ORs. The researchers found that larger room size provided more space, which decreased undesirable contacts with personnel and equipment in the OR or at the sterile field but increased the walking distance and burden on the RN circulators. The researchers con- cluded that additional research that focuses on traffic- based safety and efficiency performance metrics would provide a stronger predictive simulation design model for designing the size and layout of the OR. Bayramzadeh et al83 video-recorded 25 surgeries and coded for RN circulators’ activities, locations, and flow disruptions. The researchers found that the workstation was the main hub, but the RN circulator frequently made trips to both sides of the sterile field and the foot of the OR bed as well as to supply and support zones of the OR. The researchers con- cluded that optimal adjacencies between these zones should be considered in OR design. Cohen and Boquet77 observed 24 cardiac proce- dures for the effects of flow disruptions on the RN circulator. Using human factors taxonomy, the researchers classified 1,470 events into interruption (66.67%), coordination (15.37%), communication breakdown (8.37%), layout (7.21%), equipment (1.77%), and usability (0.61%) issues. The researchers concluded that perioperative leaders should work with staff to minimize workflow disruptions. Rapport et al78 observed 50 hours of the use of a clinical space, observed informal conversations, and reviewed five architectural plans and 45 photo- graphs of one gastroenterological surgical suite. The researchers found that fit-for-purpose spaces facilitated communication, privacy, and teamwork. Unfit-for-purpose spaces created disrupted work- flow, disharmony among teams, and physical dis- comfort. The researchers concluded that work- arounds and adaptations to an unfit layout could lead to unexpected consequences and that the neg- ative impact of unfit spaces should be minimized through evaluations of the space. Joseph et al82 observed flow disruptions during 28 surgical procedures in different ORs, including the minor (ie, no response, no task disruption) and major (ie, momentary pause, task ceasation, second- ary task engaged, repeat task) flow disruptors (FDs), the roles of staff involved, and the activities being per- formed. Flow disruptions were classified as layout (ie, inadequate space, impeded visibility, positioning changes), environmental hazards (ie, slips, colliding with staff/equipment/furniture, excessive reaching), usability (ie, operation of physical elements), inter- ruption (ie, distractions, door openings, searching for supplies), and equipment failure (ie, missing, broken, malfunctioning equipment). Activities were coded as patient-related, equipment-related, material- and supply-related, and information-related. Functional zones were support, supply, door, surgical table, and workstation zones. The researchers found when minor flow disruption rates rise, an increase in major flow disruptions follow, especially related to equipment and physical locations. The most FDs occurred in the anesthesia zone and layout-related FDs accounted for more than half of all observed FDs. The researchers concluded that the design and lay- out of the OR contributes to FDs by creating barriers to safe OR-task performance. Palmer et al80 identified 1,080 FDs for the entire perioperative team during the observation of 10 car- diac procedures. The researchers concluded that 33% of the disruptions were related to OR layout and design. They recommended that this information be used in future design projects to decrease threats to patient safety caused by FDs. Jurewicz et al68 observed six videos of anesthesia workflow and categorized tasks into patient, elec- tronic medical record, and visual display tasks. The researchers then redesigned the layout to better suit workflow and to focus on patient monitoring and increase the safety and efficiency of patient care. This observation technique could be useful for oth- ers who are customizing workspaces to fit workflows in their practice setting. Cofran et al70 studied the workflow in robotic pro- cedures and grouped observed flow disruptions into communication, coordination, environment, exter- nal factors, patient factors, surgical task consider- ations, training, and “other” for events that did not fit these categories. The researchers then reviewed the docking steps, where the highest rate of disrup- tions occurred, to optimize the room organization, retrieval of instruments and supplies, preparation for robot docking, and undocking. The researchers concluded that observing the room configuration could lead to improving the workflow by providing solutions to optimize the physical environment when renovations are not possible or during the planning process for renovations. Renovations can also be designed based on simu- lations developed in current ORs to facilitate safe care in specific situations. Sotto et al73 validated human factor methodology in user-centered analysis I-03_DesignMaint-25_110124.indd 87 I-03_DesignMaint-25_110124.indd 87 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

88 DESIGN AND MAINTENANCE of physical space during emergency cesarean proce- dures. Members of the obstetric team (N = 34) in four focus groups discussed perceived issues during the pro- cedure. The researchers grouped 30 tasks and more than 20 pieces of equipment by discipline to find inter- dependencies and potential congestion of personnel and equipment and solicited participants’ perspectives of the influence on the workflow and layout of the OR. Congestion and time spent in the OR varied by discipline, but main challenges were the size of phys- ical space and equipment, layout and orientation, and patient transport. The researchers concluded that the best scenario for safety and efficiency for a more routine, planned cesarean delivery would be design based on the human bias toward awareness of one’s own space over that of others. Observing inter- active workflow can define more efficient work zones for each discipline and reduce congestion to balance square footage in the OR. The researchers recommended that additional research be conducted on human factors and ergonomics methods related to the physical design of hospitals.73 Dubé et al75 conducted a simulation case study to evaluate the commissioning and operational deci- sions for an interventional trauma OR. Key stake- holders were involved in the evaluation, including physicians, management personnel, educators, frontline staff, the site commissioning manager, sim- ulation program personnel, human factors experts, protection services personnel, the perfusion services manager, and vendor representatives. After the sim- ulation was commissioned and the data analyzed, key stakeholders re-ran the scenarios to evaluate improvements made based on the first scenario. Changes that were facilitated included a modified patient transport route, space for switching table- tops in the OR and use of the C-arm, and improved access to protective gear required for the procedure. The researchers concluded that the simulation for systems integration with systems-focused debriefing and human factors methodology was effective for improving the design of the surgical suite. 2.5 When designing the perioperative suite for health care facilities that serve a pediatric population, implement design principles for pediatric set- tings.10,82,84,85 [Recommendation] P Moderate-quality evidence82,84,85 and FGI guid- ance10 support pediatric patient–specific consider- ations for health care design and the personnel who interact in these settings.85 Joseph et al84 observed 38 video recordings of pediat- ric outpatient surgeries and compared the table orien- tation to the number of flow disruptions, the number of contacts between team members, and the distance traveled by staff. The researchers found that, for this organization in these procedures, an angled surgical table orientation was least disruptive, and that the surgeon had fewer disruptions than the RN circulator, scrub person, or anesthesia provider. The researchers recommended that the design and operational strate- gies of the OR provide for an angled orientation. In 2017, Water et al85 collected drawings and let- ters from 175 children ages 5 to 16 years during out- patient clinic visits and analyzed the experiences and needs of the children. The researchers found that children are aware of and able to articulate what is important to them in their environment, including color and artwork. However, many chil- dren valued the warmth and care of people in the environments more than the space itself. 2.6 Review applicable FGI recommendations for the design of the surgical suite when designing small or critical access hospitals.10 [Conditional Recommendation] As defined by the FGI, small hospitals have fewer than 35 patient beds.10 Critical access hospitals are fed- erally recognized by CMS when operating as a rural primary care hospital or designated by the state. According to the FGI, small or critical access hos- pitals have design provisions that can differ from those of hospitals and outpatient facilities, including • that a cesarean delivery room can only be designated as an OR if it is readily accessible to the labor/ delivery/recovery or labor/delivery/recovery/ postpartum rooms; • the semi-restricted and restricted areas are arranged to prevent unnecessary traffic through those spaces, with clear indications for surgical attire requirements; • the environmental service room follows guidelines for hospitals, and is not shared with other areas in the semi-restricted corridor or area10; • sterilization processes conducted in the semi- restricted area (ie, immediate use steam steril- ization in a satellite sterile processing unit) follow hospital recommendations for sterile processing facility design; • a soiled workroom or soiled holding room may be considered a decontamination or gross decontamina- tion room and may be shared with unrestricted and semi-restricted areas if there is direct access from each semi-restricted area and a separate entrance from the unrestricted area with no direct con- nection to ORs or other sterile activity rooms; • a clean equipment and clean and sterile supply storage in the semi-restricted and restricted areas may be combined and directly accessible to the semi-restricted area and may be directly accessible to the ORs but separate with no direct connection to the soiled holding room; I-03_DesignMaint-25_110124.indd 88 I-03_DesignMaint-25_110124.indd 88 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

89 DESIGN AND MAINTENANCE • clean equipment and sterile supply storage may be combined and designated as semi-restricted or restricted for facility operations; • clean linen storage may be located in the clean storage room; • along with a staff lounge, a staff locker area and changing area with one or more private changing rooms is provided for the surgical suite staff to include lockers, showers, toilets, hand washing stations, space for donning and doffing surgical attire, and provision for separate storage of clean and soiled surgical attire; • an additional documentation area and self-contained medication dispensing units may be included in the storage area; and • Class 3 imaging rooms follow all OR specifica- tions and other imaging room classification requirements.10 2.7 The perioperative RN on the interdisciplinary team should participate in the development of documents related to the design project, including • a space program; • environment of care requirements; • a functional program; and • facility-specific documents that require clinical input (eg, education plans, radiation shielding plans for a hybrid OR).10,11,28 [Recommendation] Regulations under 42 CFR §482.41 detail require- ments for physical space in the hospital, including safety and maintenance.28 Involving the interdisciplin- ary team in the maintenance of reports, compliance, documentation, and communication for each compo- nent of the safety risk assessment (SRA) provides the expertise of essential personnel throughout the design project.10 Documenting that the owner (ie, per- son or entity with legal and fiscal responsibility for operating the health care facility) has received the design drawings and manuals regarding the construc- tion; fixed equipment (eg, location, selection); and mechanical, electrical, plumbing, and structural sys- tems (ie, estimated use, life safety plan,34 and known deviations from the construction) when occupancy of the building begins facilitates patient, staff, and worker safety.10 During design of a hybrid OR, sharing specifications and drawings with the radiation consul- tant can facilitate planning the optimal layout, equip- ment, and shielding requirements.17 2.7.1 Include information for environment of care components and key elements of physical environmental evaluation, including the • delivery of care model concepts; • patients, visitors, physicians, and staff accommodation and flow; • movement of supplies; • building infrastructure and systems design (ie, description of design criteria for the physical environment necessary to support organizational, technological, and building systems that facilitate the delivery of care model); • physical environment elements (ie, light, views of and access to nature, wayfinding, user control of the environment, privacy and confidentiality); • security; • architectural details, surfaces, and built-in furnishings; and • ways in which the space engages respect- fully with individuals from different cul- tures, languages, classes, races, ethnic backgrounds, disabilities, religions, gen- ders, sexual orientations, and other diver- sity factors.10 [Recommendation] 2.8 The functional program should include the • new or renovation construction, occupancy, and building systems involved; • scope, type (eg, surgical specialties), and loca- tion of operative and invasive procedures to be provided; • scope, type, and location of anesthesia services to be provided; • design and location of each type of patient care area required; • patient population and anticipated volume of inpatients and outpatients; • projected volume of procedures; • design and location of preoperative and postop- erative patient care areas; • type and number of patient care stations for the preoperative and postoperative care staffing requirements; • utility requirements; • environmental requirements; • security requirements; • documentation requirements (eg, information technology infrastructure, space); • communication requirements; • infrastructure to support communication; • storage requirements; • technological requirements; • indirect support functions; • sterile processing and supply movement requirements; • location of support areas; and • operational requirement, departmental opera- tional relationship, and required adjacencies.10 [Recommendation] I-03_DesignMaint-25_110124.indd 89 I-03_DesignMaint-25_110124.indd 89 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

90 DESIGN AND MAINTENANCE The functional program is the foundation for the construction project and is intended to inform stake- holders (eg, construction project personnel, health care organization personnel) throughout the project by communicating details of the functional and operational requirements of any new, major, or minor renovation project. In whatever form that it is compiled (eg, charrette, Lean framework, subcom- mittees) or presented (eg, simple sketch, major port- folio), the plan may also be used as a supplemental construction document.10,11 After the functional use of the space is deter- mined, the type of patient care areas and their design, number, and location is easier to decide based on multiple factors (eg, owner, designers, con- struction restraints, patient population, procedure types). The intended purpose and future use of the space for imaging procedures requires specific con- struction design (eg, shielding, structural support, fixed and adjunct technologies), layout (eg, type, location, amount of radiation protection, equipment footprint), and equipment (eg, 3D imaging recon- struction, echocardiography, intravascular ultra- sound, digital subtraction angiography, video inte- gration system with picture archiving, audiovisual recording).17 2.8.1 When contributing to the development of the functional program, the perioperative RN should consider both current and known future perioperative needs, including • patient population (eg, acuity, cultural needs specific to the community, spaces that support privacy and dignity for the diverse population served, safe patient han- dling and movement of patients with obesity), • infection prevention (eg, physical distancing), • design features that improve productivity (eg, analysis of traffic patterns and distance traveled for normal patient flow), • disciplines served, • plans for future expansion, and • technology used or anticipated (eg, data shar- ing, interoperability infrastructure).53-55,86,87 [Recommendation] Moderate-quality86 and low-quality53-55,87 evi- dence supports understanding the diverse needs of the intended patient population to optimize the design of health care settings. Scholz et al86 conducted a systematic review of architectural separation of septic and aseptic ORs to improve process quality and patient out- comes. With this OR layout, septic, or contami- nated, procedures were scheduled at the end of the day after aseptic procedures (ie, for patients who are not infectious), which left patients undergoing septic procedures with unsatis- factory procedural times and treatment. The researchers found 572 articles, though none addressed the risks/benefits/harm analysis of this OR layout technique. The researchers con- cluded that established practices should con- tinue while additional research on patient out- comes and health care organization processes and costs are conducted. Wingler and Hector55 surveyed one organiza- tion’s staff regarding the effect of the built envi- ronment on the staff’s quality of life measured in health status (perceived and evaluated), satis- faction, and productivity. The researchers ana- lyzed 75 participants’ data and found that qual- ity of life and perceived productivity increased as there was an increase in interior features directed toward reducing stress. The research- ers concluded that natural light; color, texture, and finishes; and ease of communication with colleagues should be given priority regarding quality of life and speech privacy. The research- ers also concluded that future research should obtain a baseline of quality of life and study both patients and staff, correlations between the two, and differences between departments. Nisly et al53 described ways to provide an inclusive and welcoming lesbian, gay, bisex- ual, transexual, queer (LGBTQ) clinic, which the authors recommended adapting to diverse health care models such as the OR. The authors suggested obtaining buy in from an interdisci- plinary team that includes LGBTQ-identifying persons. Additionally, changing the process for patient information collection and identifica- tion documentation can promote inclusion (eg, understanding of different gender identities). Including gender neutral or gender inclusive restrooms in the physical space and having pharmacists, clinic nurses, and schedulers who are trained in providing suitable education, rec- ommendations, and care can help provide a safe space for this patient population. American College of Surgeons Geriatric Stan- dards recommend rooms with enough space for visitors, including caregivers, and elements to reorient older patients such as large clock and team member name displays.54 The intended population and the volume of patients are important to note when devel- oping a functional program because patients’ age, acuity, and the special needs of persons of size are important when equipping the space. For example, planning to accommodate care I-03_DesignMaint-25_110124.indd 90 I-03_DesignMaint-25_110124.indd 90 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

91 DESIGN AND MAINTENANCE of individuals of size necessitates projecting weight capacities; number of spaces; and num- ber of expanded capacity lifts needed to deter- mine the design and maintenance response required.10 Also, because preoperative and post- operative spaces may be separate or combined (eg, preoperative and Phase I and II postopera- tive spaces together, all separate), the layout of the patient care areas (eg, bays, cubicles, rooms) can help optimize the surgical suite design in conjunction with the perceived work- flow before construction or renovation projects begin.10 Additional considerations, including envi- ronmental requirements for HVAC design and maintenance, can also determine construction or renovation constraints and indirect support functions, including future demand changes and the staff required to accommodate those changes. Operational requirements related to project components (eg, traffic patterns of staff, patients, and the public; delivery and disposal of products, materials, and equipment) will also affect the design.10 2.9 The interdisciplinary team should create and maintain an initial and ongoing SRA for construc- tion projects that begins early in the planning phase and continues throughout the project and includes • an infection control risk assessment (ICRA); • a patient handling and movement assessment (See the AORN Guideline for Safe Patient Han- dling and Movement88); • a fall prevention assessment (See the AORN Guideline for Safe Patient Handling and Movement88); • a medication safety assessment (See the AORN Guideline for Medication Safety89); • a behavioral and mental health risk assessment; • a patient immobility assessment; • a security risk assessment; • a disaster, emergency, and vulnerability assessment; and • factors that support a safe design and assist in creating the criteria needed to support the selection of equipment, furnishings, finishes, surfaces, and HVAC systems.10 [Recommendation] Low-quality evidence19,22 and consensus state- ments10,11,90 support completion of all or a portion of the items in this list and communicating about the elements of the SRA to responsible stakeholders.10 The degree of detail expressed is dependent on the scope of the project (See Recommendation 4.3 for renovation SRAs) and the population served as well as potential hazards specific to each part of the proj- ect, the evaluated risk of each, and solutions for each.10 See Section 5 for recommendations about implementing environmental contamination coun- termeasures identified in the ICRA. 2.9.1 Perform an ICRA as part of the SRA. [Recom- mendation] Moderate-quality evidence,91 expert opinion documents,10,40,41 and the Centers for Disease Control and Prevention (CDC) Guidelines for Environmental Infection Control in Health Care Facilities92 support using the elements of the ICRA to guide health care construction projects, including verifying the level of negative pressure and exhaust from the construction site during the project, as well as performing a final clean- ing and inspection of the site prior to resuming patient care. The CDC and the Healthcare Infection Control Practices Advisory Committee recommend envi- ronmental infection control measures related to internal construction and repair project steps, including • preparing for the project; • educating the staff and construction workers; • posting hazard and warning notices; • relocating high-risk patients as applicable; • establishing alternative traffic patterns for staff, patients, visitors, and construction workers; • erecting suitable barrier containment; • establishing proper ventilation; • controlling solid debris; • controlling water damage; • controlling dust in air and on surfaces; and • completing the project.92 Collinge91 analyzed construction project re- sources with 21 interviews of personnel involved with design of hospitals and found that failure to identify issues and communicate these issues with the design team (eg, through briefings and schematic plans) resulted in delays, stop- pages, and redesign of work regarding infection control. For instance, if a bridge between the new and old facility is required to move ster- ile items to the new location but is not planned in the original design, it will take significant work to reevaluate and revise the design to include building a bridge that meets specifica- tions. This could not only delay the project, but also increase expenses. The researchers rec- ommended having an awareness of relevant regulatory guidance; promoting collaboration between clinical staff and the design and con- struction team; monitoring infection control I-03_DesignMaint-25_110124.indd 91 I-03_DesignMaint-25_110124.indd 91 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

92 DESIGN AND MAINTENANCE issues; and establishing an infection prevention control team that reviews each phase of the con- struction project life cycle to promote a smooth, safe project. However, the researchers recom- mended additional research regarding commu- nication of infection control requirements. The ASHE supports safe design that promotes infection prevention, including the design of HVAC/plumbing systems as well as the selection of surface and furnishing material used for con- taining contaminants generated during construc- tion and to haul away debris.40 See Section 5 for recommendations about implementing environ- mental contamination countermeasures. 2.9.2 Collaborate with the interdisciplinary team to establish and implement infection risk mitigation strategies that were identified during the ICRA. [Recommendation] The ICRA can identify issues that require miti- gation. The FGI gives specific guidance on risk mitigation strategies based on infection control risk and security measures. Using the infec- tion control risk mitigation strategies during construction and commissioning and when the HVAC (eg, airflow, exhaust, pressure gradients) or plumbing systems and equipment are started and restarted facilitates a safe environment of care.10,93 The FGI recommends having written plans to be implemented by the ICRA team for preventing transmission of airborne and waterborne biological contamination. These written plans can include • potential patient relocation; • standards for barriers and protective mea- sures; • temporary provisions or phasing for HVAC (including airflow, exhaust, and pressure gra- dients) and water supply systems; • demolition potential; • education needs among personnel who will work in the construction zone and plans for training; • effects of potential utility outages or emer- gencies; • movement of debris, traffic flow, cleanup, ele- vator use, and construction routes; • provision for bathroom and food facilities for construction workers; and • installation of clean materials that are not damaged by water (ie, protected during con- struction).10 Apisarnthanarak et al93 discussed infection prevention and control experiences related to flood emergencies in which hospitals were closed and reopened after excessive flooding. These included an initial phase (eg, evalua- tion and water removal), renovating phase (eg, cleaning and disinfecting, mold remediation, HVAC and area decontamination, construction and renovation, assessment), and maintenance phase (eg, reopening with cleaning and disin- fection, HVAC and air sampling, laboratory- based post-flood surveillance, sewage and waste management). Having persons specifically dedicated to infection control barrier monitoring can facili- tate a safe environment of care for patients and staff during construction projects. Kanamori et al22 conducted a systematic review to examine fungal outbreaks related to hospital construc- tion and offer infection prevention and control measures from the evidence, experience, and guidelines. Forty-nine studies were included and two addressed fungal infections and mor- tality after surgery. The authors concluded by presenting a bundle for preventing filamentous fungal infections that included notifying facil- ity epidemiologists before construction activi- ties begin; conducting and following strategies provided by the ICRA; controlling airborne dissemination of fungal spores (eg, using bar- riers, containment, air management, portable high-efficiency particulate air [HEPA] filters); including both involved and adjacent facility units; maintaining surveillance, investigating fungal infection cases, and revising prevention efforts when needed; and confirming ongoing compliance with recommended prevention guidelines. See Section 5 for recommendations about implementing environmental contami- nation countermeasures. 2.10 Create a plan for infection prevention and main- taining internal air quality during construction or renovation.19,94-96 [Recommendation] Low-quality evidence19,94,96 and guidelines90 sup- port containing the by-products of demolition and construction by implementing measures before and monitoring their efficacy during the project. The dust may contain asbestos or fungal contaminants, which can be contained to protect those involved and physically close to the construction project. Loschi et al96 observed the incidence of invasive pulmonary aspergillosis in neutropenic patients during the hospital renovation after implementing an air sampling of mechanical preventive mea- sures. These measures, developed by an interdisci- plinary team, included • air lock chambers placed between units and build- ing sites 2 months before renovations began and the windows sealed 1 month before; I-03_DesignMaint-25_110124.indd 92 I-03_DesignMaint-25_110124.indd 92 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

93 DESIGN AND MAINTENANCE • rigid plastic walls that created air lock chambers of each pollution zone; • mechanical doors and adhesive carpets that col- lected dust at entryways; • surgical masks for patients when outside of their rooms; • moistening of construction debris daily to mini- mize dust generation; • rubble containers that were covered and quickly removed; and • pedestrian traffic redirected away from construc- tion work sites.96 In the case of increased risk or an actual increase in contamination, the interdisciplinary team isolated supplementary chambers and confirmed air quality with samples immediately afterward. The research- ers analyzed 705 hospitalizations of 438 patients dur- ing the 5-year renovation period and found that risk factors for patients who developed infections were not related to the renovations, but rather to underly- ing disease, treatment course, mean duration of neu- tropenia status, and a disease process that required hospitalization.96 In 2012, Scarlett et al94 took surfacing, thermal system insulation, and other potentially asbestos- containing building material samples from Jamaican hospitals. The researchers found samples containing asbestos in 16 of 26 hospitals, regardless of the age of the building. The asbestos was found mainly in the thermal system insulation for boilers and steam pipes in poor condition (eg, no longer used), indicative of a high risk for asbestos exposure as fibers are released. The researchers concluded that an asbestos contain- ment policy that includes worker exposure, warning signs, and requisite management is needed during demolition and construction. Most modern health care construction in developed countries does not contain asbestos; however, some older buildings could have been constructed using asbestos-containing materials. Containing asbestos during demolitions is important because it is a known carcinogen for which OSHA has established a permissible exposure limit in the workplace of 0.1 fibers/cc of air. Olmsted19 described the use of the ICRA and dis- cussed steps to mitigate infection risk during con- struction and renovation of health care spaces. The author concluded that developing policies and pro- cedures for infection control, safe work practices, training, monitoring, contingencies, and authority have significant influence on trends throughout the construction and commissioning of the project. Chang et al90 provided consensus guidelines for implementation of quality processes to prevent inva- sive fungal disease and enhanced surveillance mea- sures during hospital building work. These include standard quality processes (eg, targeted air sam- pling), hospital building work (eg, to reduce patients’ exposure to dust, stagnant water, and damp areas), and outbreak management (eg, active and enhanced surveillance for invasive fungal disease cases). The authors combined international guideline elements, including • keeping at-risk patient areas positively pressurized compared to the outside, • maintaining negative pressure in the construction area, • installing and maintaining filters, • sealing clinical areas from outside air effectively, • carrying out surveillance for active cases, • using an N95 respirator or equivalent for high- risk patients when outside of their protective environment, • using HEPA air filters in high-risk patient rooms during construction, and • maintaining minimum air exchanges > 12 per hour for high-risk patient rooms.90 2.10.1 Implement interventions to control or reduce air contamination including provisions to con- trol or mitigate • dust generation (eg, using a dust collection system, such as during finishing of gypsum wallboard partitions); • dust from entering occupied (or completed) areas of the facility (eg, creation of barriers applicable to the type of construction occur- ring, maintenance of barrier integrity, cre- ation of special construction-related traffic pathways, entrances, and exits, cleaning with HEPA-filtered vacuums92); • dust from entering the existing or finished HVAC system (eg, use of negative pressure and HEPA filters on the construction side of the barrier); • generation of aerosols from contaminated water sources; • debris buildup; • alterations in ambient interior temperature and humidity levels; and • mold and bacteria growth. [Recommendation] Low-quality evidence93,97,98 and guidelines90 support containing the by-products of demoli- tion and construction. The dust may contain asbestos or fungal contaminants.96,97 In a nonex- perimental study, Scarlett et al94 found asbestos in 16 of 26 hospitals. The asbestos was found mainly in the thermal system insulation. The researchers concluded that an asbestos contain- ment policy is needed during demolition and construction. Experts also recommend adher- ence to these measures.22,90,93,99,100 I-03_DesignMaint-25_110124.indd 93 I-03_DesignMaint-25_110124.indd 93 11/7/2024 10:33:27 AM 11/7/2024 10:33:27 AM

94 DESIGN AND MAINTENANCE Boix-Palop et al99 investigated a pseudo- outbreak of Bacillus spp and found that the num- ber of blood cultures yielding the same Bacillus spp increased from 24 out of 7,628 samples to 59 out of 3,469, correlating with material, surface, and air sample contamination. The researchers concluded that ineffective barriers during con- struction led to the increase in infections. Semchuk100 discussed measures used to opti- mize indoor air quality and infection control during construction of one hospital. The author discussed managing air quality with special- ized construction air-handling equipment to con- trol internal temperature and humidity, with inspection and monitoring to facilitate compli- ance. Several interventions were used to control dust and debris buildup, minimize nutrients for potential spores and bacteria, leave an organized site, and reduce spillage or leftover foodstuff. The interventions included • a dust collection system, • daily cleaning with sweeping compound and HEPA-filtered vacuums, • walk-off mats with boot cleaners, • capsulation of ductwork during on-site installation, • negative air intake outlets for outside air relief with minimum efficiency reporting values (MERV) 8 filters, • ceiling plenum observation and cleaning, • negative air units inside pressurized zoned control corridors, • air lock vestibules separating areas and differ- ent phases of construction, and • a final review of previously identified deficien- cies and pressure maintenance. The author concluded that these processes developed by the team had since influenced regulations in Canada to positively affect health care facility construction. 2.11 Determine the zones of protection (Table 1) for each construction area as part of the SRA and identify security measures for each.7,10,35 [Recom- mendation] The SRA includes a project security plan for con- struction and renovation projects regarding the risks from the environment, function of project space, and construction process that includes a description of the demolition and phasing impact, temporary secu- rity barrier needs (ie, intrusion detection, video sur- veillance systems), installation schedule and design features specific to the patient population, and envi- ronmental factors related to the project scope.10 The International Association for Healthcare Security & Safety (IAHSS) security design provides more details on this assessment.7 2.11.1 The security plan should include provisions for • designation as authorized staff-only